EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
SpiritOfMudsuck
-
Listing for Category : documents
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (686)
Avionics
- (33)
Cockpit
- (33)
Controls
- (69)
Cowling
- (29)
Documents
- (5)
Empennage
- (105)
Engine
- (78)
-
Clamps for Secondary...
-
Mixture Control Arm...
-
Mixture Control Cable
-
Mixture Control Cable
-
Makeup new oil lines
-
Attach Oil pressure...
-
Turbo cooling plumbing
-
EGT sensors
-
Low oil level mark
-
Turbo Exhaust Flange
-
Secure oil lines
-
Install turbo oil...
-
CHT & oil...
-
Attach oil cooler...
-
Oil Cooler Baffling
-
Cutout cooling air...
-
Turbo Radiator...
-
Remove Center...
-
Port rear baffle fitup
-
Fit Turbocharger Intake
-
Port Side Baffle...
-
Reinforce oil filter...
-
Turbocharger Mounting
-
Turbo Radiator/Plenum
-
Mount/Plenum for...
-
Set Cooling Lines...
-
Set Nutplates on...
-
Master...
-
Waste Gate Actuator...
-
Turbocharger Fitup
-
Research alternate...
-
Starboard Cylinder...
-
Cooling Pump Test
-
Aft oil line clamp
-
Remove Turbo, Tap...
-
Oil return line from...
-
Turbo Shroud
-
Secure Oil Lines
-
Install Port CHT...
-
Plenum for Turbo...
-
Oil Vapor Vent Line
-
Install AN4 oil lines
-
Turbo/Intake/Starter...
-
Turbo Cooling...
-
Install oil pressure...
-
Tubocharger Fit
-
Manifold Alignment
-
Install bulkhead to...
-
Spark plug passthrough
-
Cooling Baffle
-
Secure Port Side Baffle
-
Baffle Support
-
Mark Dip Stick
-
Cooling Baffle Fitup
-
Initial Fence Baffle...
-
Secondary Ignition...
-
Oil Return Line
-
Turbocharger Mount
-
Drill & Tap Oil...
-
Check Upper Turbo...
-
Mount Exhaust Manifold
-
Engine Mounting,...
-
Bolt Engine Mount to...
-
Install Time-Serts,...
-
Install Port Head...
-
Push-rod Assembly
-
Assembly
-
Determine Cylider...
-
Trim cylinder head...
-
Evaluate & Dress...
-
Setup Compression Ratio
-
Assembly, Torque...
-
Case Prep &...
-
Crankshaft &...
-
Case prep
-
Cam and Crank Assembly
-
Pickup AeroVee Kit
-
AeroVee 2.1 Turbo...
Ext. Finish
- (34)
Firewall Forward
- (14)
Fuel System
- (6)
Fuselage
- (14)
Hangar
- (106)
Interior Finish
- (6)
Instrument Panel
- (72)
Inspection
- (2)
Landing Gear
- (6)
Propeller
Radios
- (8)
Research
- (21)
Tools
- (11)
Wings
- (34)
Builder Name:
Pete Dailey
-
Project:
Sonex - Xenos-B Motorglider
-
VIEW REPORTS
Total Hours:
1506.3
Total Flight Time:
Total Expense:
$75148.03
Start/Last Date:
Jul 01, 2016 - No Finish Date
Engine:
Aerovee 2.1 Turbo
Propeller:
Sensenich
Panel:
MGL Avionics Explorer iEFIS/ECB/RDAC
Friendly URL:
https://eaabuilderslog.org?s=SpiritOfMudsuck
Home or Last Project Picture
Jan 31, 2017
MGL iEFIS Programming Documents
- (2 hours)
Category: Documents
Collect iEFIS documents from MGL Avionics web site.
Autopilot.pdf
capstan servo install.pdf
iEFIS Autopilot.pdf
iEFIS alteration guide.pdf
iEFIS relocatable modules.pdf
Jan 31, 2017
MGL iEFIS Explorer Docs
Category: Documents
MGL ECB.pdf
iBOX V1 installation manual.pdf
iEFIS installation manual.pdf
iEFIS user manual.pdf
Jan 31, 2017
AeroVee 2.1 Turbo
Category: Documents
AeroVee_2point1_Turbo_Manual.pdf
Jan 17, 2017
Unload & Transfer QB Kit Parts
- (9.5 hours)
Category: Documents
Rented 26 foot U-Haul and met Partain's over the road driver Michael and his dog Bear. Transferred QB fuselage, wings and boxes in a large isolated parking lot 1/2 mile off the Interstate. Took two trips to transfer the QB kit to Hangar 40 at WV12.
Fuselage @ hangar
Loading Wings In UHaul
Randy Installing Tie-down in UHaul
Fuselage in Partain trailer
wing-port.jpg
wing_stbrd.jpg
Aug 16, 2016
N-number Reservation
- (0.1 hour)
Category: Documents
FAA N-number reservation confirmation for N25XB.
FAA Registry - Aircraft - N-Number Inquiry.pdf
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.